Hardware notebook

Week by week,
23 March to 17 October 2026

The pages below are the notebook itself, exactly as the team laid it out — 94 pages covering 30 weeks. They run top to bottom in one continuous scroll rather than a page at a time, so you can read straight through or jump by week from the index on the left.

When each one was being built

One team, 30 weeks. Every mark is an entry — click one to jump to that week below.

Build timeline W04–W33 · 2026
W07–W33
W18–W32
W13–W30
Humidity box
W05–W12
Imaging station
W13–W13
Floating plate
W17–W17
Pre-pivot
W04–W11
Notebook page 1
Page 1 of 94
Notebook page 2
Page 2 of 94
Notebook page 3
Page 3 of 94
WEEK 04 — Sourcing finished, purchasing frozen
Page 4 of 94
Notebook page 5
Page 5 of 94
WEEK 05 — Visiting Prof. Verslues
Page 6 of 94
WEEK 06 — Told to drop soil sensing
Page 7 of 94
Notebook page 8
Page 8 of 94
WEEK 07 — The pivot, and asking Dr. Pak where to start
Page 9 of 94
Notebook page 10
Page 10 of 94
WEEK 08 — Working out what a stress assay should measure
Page 11 of 94
WEEK 09 — Nothing much happened
Page 12 of 94
WEEK 10 — Four instruments, three people
Page 13 of 94
WEEK 11 — Dropping the fluorometer
Page 14 of 94
Notebook page 15
Page 15 of 94
WEEK 12 — Humidity box finished, agar photos useless
Page 16 of 94
Notebook page 17
Page 17 of 94
WEEK 13 — Building the agar plate imaging station
Page 18 of 94
Notebook page 19
Page 19 of 94
WEEK 13 — Assembly guide tested by handing it over
Page 20 of 94
Notebook page 21
Page 21 of 94
WEEK 14 — Bioreactor prototype I built
Page 22 of 94
Notebook page 23
Page 23 of 94
WEEK 15 — The cells barely grow in the reactor
Page 24 of 94
Notebook page 25
Page 25 of 94
WEEK 15 — Prototype II reaches plateau in two hours
Page 26 of 94
Notebook page 27
Page 27 of 94
WEEK 16 — Prof. Chang finds the gap in the design
Page 28 of 94
Notebook page 29
Page 29 of 94
WEEK 16 — Wrong unit for the light dose
Page 30 of 94
Notebook page 31
Page 31 of 94
WEEK 16 — Temperature sensor driving the green channel
Page 32 of 94
Notebook page 33
Page 33 of 94
WEEK 17 — Making the plate float
Page 34 of 94
Notebook page 35
Page 35 of 94
WEEK 18 — Iteration 1. Bubbles and drift
Page 36 of 94
Notebook page 37
Page 37 of 94
WEEK 18 — Iteration 2. Zeroed against the wrong thing
Page 38 of 94
Notebook page 39
Page 39 of 94
WEEK 18 — Rewriting the spec, and pulling a claim
Page 40 of 94
WEEK 19 — Iteration 3. Response does not double
Page 41 of 94
Notebook page 42
Page 42 of 94
WEEK 19 — Transmembrane pressure on a screen
Page 43 of 94
Notebook page 44
Page 44 of 94
WEEK 20 — LPA V3 finished
Page 45 of 94
Notebook page 46
Page 46 of 94
WEEK 20 — Measuring every LED before wiring
Page 47 of 94
Notebook page 48
Page 48 of 94
WEEK 20 — Reading four times high on the reactor
Page 49 of 94
Notebook page 50
Page 50 of 94
WEEK 21 — Starting the nineteen-day run
Page 51 of 94
Notebook page 52
Page 52 of 94
WEEK 22 — The photometer catches the pump failing
Page 53 of 94
Notebook page 54
Page 54 of 94
WEEK 22 — Plotting the 434-hour trace with 1 August marked
Page 55 of 94
Notebook page 56
Page 56 of 94
WEEK 23 — Decision matrix: pinch valve actuator
Page 57 of 94
Notebook page 58
Page 58 of 94
WEEK 23 — Assembling the full rig
Page 59 of 94
Notebook page 60
Page 60 of 94
WEEK 23 — Rewiring the light plate after it stopped lighting
Page 61 of 94
WEEK 24 — Where the bioreactor stood on 13 August
Page 62 of 94
Notebook page 63
Page 63 of 94
WEEK 24 — Pressure on the new membrane, and the magnetic pump fails its first job
Page 64 of 94
Notebook page 65
Page 65 of 94
WEEK 25 — Pressure drop against flow rate
Page 66 of 94
Notebook page 67
Page 67 of 94
WEEK 25 — Rebuilding the reactor inside a computer case
Page 68 of 94
Notebook page 69
Page 69 of 94
WEEK 25 — Calibrating against weighed titanium dioxide
Page 70 of 94
Notebook page 71
Page 71 of 94
WEEK 26 — Not ready for the forum
Page 72 of 94
Notebook page 73
Page 73 of 94
WEEK 27 — First integrated run: the protectant crosses the membrane
Page 74 of 94
Notebook page 75
Page 75 of 94
WEEK 27 — The cased reactor in front of the public
Page 76 of 94
WEEK 28 — Drawing the rig as built, and why every transducer gets a filter
Page 77 of 94
Notebook page 78
Page 78 of 94
WEEK 29 — A cheaper photometer: fibres in place of the lens and beam splitter
Page 79 of 94
WEEK 29 — First culture under the light plate, and the post snaps on the shaker
Page 80 of 94
Notebook page 81
Page 81 of 94
WEEK 30 — Black holder, four screws, MOSFETs inside
Page 82 of 94
Notebook page 83
Page 83 of 94
WEEK 30 — Soldering the valve power system
Page 84 of 94
Notebook page 85
Page 85 of 94
WEEK 31 — Registering a growth-rate forecast before the run
Page 86 of 94
WEEK 32 — Run 5: the reading breaks down after ten hours
Page 87 of 94
Notebook page 88
Page 88 of 94
WEEK 32 — Silica calibration: both photometers on one series
Page 89 of 94
Notebook page 90
Page 90 of 94
WEEK 32 — Modelling the lab bioreactor as it is plumbed
Page 91 of 94
WEEK 33 — Run 6: a clean curve, and the forecast passes
Page 92 of 94
Notebook page 93
Page 93 of 94
WEEK 33 — Auditing the parts list, and finding the pressure scaling wrong
Page 94 of 94